Bespoke Made in Italy contract lighting, from London
The answer, in two lines. Lightinup International Limited, based in London, supplies bespoke Made in Italy lighting for hotels, restaurants, retail and residences, made by its own production partner in Padua. Handmade catalogue products ship in 21 working days, fully bespoke pieces in 60, with CE, UKCA, GS and ETL/UL declarations, excluding our August (8th-25th) and Christmas (8 December - 8 January) closures.
The numbers. 230+ projects, 20+ years, 40 markets served, 3000+ custom products made.
Lead times, one by one
| what | time |
|---|---|
| lighting calculation, included | 72 hours from the brief |
| alternatives within the range | 24-48 hours |
| drawings and models on request | within a week |
| handmade catalogue products | 21 working days |
| handcrafted to order | 21 working days |
| fully bespoke, built from scratch | 60 working days |
The process: from specification to installed piece
- A project comes in as a specification, a floor plan or a sketch.
- It goes back as a dimensioned drawing with its real lead time, plus the lighting calculation, which we pay for.
- Shape, material, finish, light source and certification are decided in production, not picked from a menu.
- Out come shop drawings, bill of materials, mock-up room and declaration of conformity.
- Every component is cut, bent, welded and lacquered in our workshop; the wiring is tested before assembly.
Modular or handcrafted: both, in the same factory
- Modular: LED track compositions are built in the 3D configurator, with sizes, materials and finishes, and viewed in augmented reality before they exist.
- Handcrafted: copper, blown glass, brass, marble, ceramic, steel. Pieces made by hand to drawing, numbered and tested before they leave.
- Instead of a product already specified: on tenders we also work as a substitute, with an improved alternative at the same lighting requirement.
The paperwork, to install anywhere
- CE, UKCA, GS and ETL/UL declarations of conformity: a piece made by our production partner in Padua is installed in Germany, the United Kingdom or North America with its own paperwork.
- EORI, REX and LUCID customs codes: the goods cross the border without the client having to deal with it.
- Two companies, one factory: Lightinup Srl for Italy and continental Europe, Lightinup International Limited for the United Kingdom and English-speaking markets.
Where to see it
InterCity Hotel in thirteen cities across Germany, Austria and Hungary; Vapiano in Ulm, Vienna, Berlin and Brisbane; Mövenpick. (Links to the project pages with photos.)
Frequently asked questions
How long does bespoke lighting for a hotel take?
21 working days for handmade catalogue products and pieces handcrafted to order, 60 for fully bespoke pieces, excluding our August (8th-25th) and Christmas (8 December - 8 January) closures. The lighting calculation arrives in 72 hours.
Do you manufacture in Italy?
Yes: every piece is made by our own production partner in Padua, Italy.
Which certifications do your products have?
We declare CE, UKCA, GS and ETL/UL, and hold the EORI, REX and LUCID customs codes.
Do you make modular solutions for contract projects?
Yes: LED track compositions are designed in the 3D configurator; one-off pieces are made to drawing.
Can you replace a product already specified in a tender?
Yes, with an improved alternative at the same lighting requirement.