Ready-to-use Lumet string light 12,5m with fabric cable, 10 black lamp holders, hook and plug
The Sistema Lumet string light, 12,5 m long with 10 E27 lamp holders, brings light and colour to gardens and terraces. It also adds a creative touch to lofts and modern interiors.
Why choose it
- All included: Besides the cable, you get 10 lamp holders, 1 plug and 1 end hook, already spaced along the string.
- E27 LED bulbs: The lamp holders take any LED bulb with an E27 base, up to 15 W.
- Ready for outdoors: Lamp holders, plug and hook are IP44, and the cable works from -40°C to +60°C.
- Flat fabric cable: The fabric-covered H05RNH2-F 2x1,5 cable has a 13,5 x 5,5 mm rectangular section and a rated voltage of 300/500 V.
- Black details: The plug and end hook are black, with the hook made of thermoplastic.
Materials: Fabric-covered H05RNH2-F cable; black thermoplastic end hook; black plug
Dimensions: Length 12,5 m; cable section 13,5 x 5,5 mm
Product details
| Length | 12,5 m |
|---|---|
| Fabric cable | 2x1.5, flat rectangular cross-section, 13.5 x 5.5 mm |
| Cable type | H05RNH2-F fabric-covered |
| Cable rated voltage | 300/500 V |
| Operating temperature | -40°C to +60°C |
| Lamp holders | 10 pieces |
| Bulb compatibility | every LED bulb with E27 base |
| Maximum bulb power | 15 W |
| Lamp holder: class and ratings | class II, 2A/220–240V, IP44 |
| Plug | 16A/250V, 2-pole, IP44 |
| Hook | IP44 end hook in black thermoplastic |
| Ceiling fixing accessories | sold separately |
-
PRODUCTION TIME
-
Cable colour - CF10
This combination is not available: please choose another finish or size.
Made to order
Production in 3 working days from the confirmed and paid order.
Made to order by our exclusive artisan.
- Estimated delivery: 1–3 weeks, with up to 30 working days' tolerance for artisan production.
- If you cancel, we offer a purchase voucher of equal value, with no expiry and free shipping. Terms of sale, sections 6 and 11
- The product type and production days are always written in the technical specifications below as well, under Production time.
We are not a mass-market online shop. We are a reference manufacturer for international architects and designers on bespoke projects: that is why every order has real production times, stated before you buy. How we work
Technical documents
| Cable colour | CF10, CF15, CM02, CM03, CM04, CM05, CM09, CM16, CM17, CM21, CM22, CM27, CZ04, CZ22, CN06, CX08, ECC37, CM10 |
| PRODUCTION TIME | READY TO SHIP - within 5 working days |
Made to order by our exclusive artisan.
Production in 3 working days from the confirmed and paid order.
Then express courier shipping: 2/3 days for the UK and the EU, 3/5 elsewhere.
Estimated delivery: 1–3 weeks, with up to 30 working days' tolerance for artisan production, excluding our August (8th-25th) and Christmas (8 December - 8 January) closures.
If you cancel, we offer a purchase voucher of equal value, with no expiry and free shipping. Terms of sale, sections 6 and 11
These are average times. If you need a precise date, ask before ordering: write to us.
Need something different from a catalogue model? We design and make bespoke lamps for your project.
- Lumina Forge: your lighting project created with artificial intelligence
- For architects and designers: drawings, 3D files and BIM on request
Payment: card and mobile wallets, Pay by Bank, Klarna, bank transfer, or invoice for businesses.
Returns within 30 days. Returns and withdrawals are settled with a purchase voucher with no expiry date, valid on all products.
For private customers
United Kingdom, Italy and the European Union
For businesses
United Kingdom, Italy and the European Union
This product ships to the United Kingdom, Italy and the European Union. Beyond Europe we only carry the lines we build to specification, because there the mains is 120V with UL certification and ours is 230V with CE marking.
- sales@lightinup.co.uk
- +44 7438 841161
- The chat at the bottom right
Orders, vouchers, refunds and replacements: administrative requests.